Sizing case: quantity of sewerage hatchways in London

Hello, dear members of preplounge!

Recently I have been asked a question to evaluate the quantity of sewerage hatchways in London. Fortunately, it wasn't at the interview because I got confused.

How would you begin? What will be the starting point for calculations? The length of the streets? The population?

Thank you!

1
4.3k
18
Be the first to answer!
Nobody has responded to this question yet.
Top answer
Sidi
Coach
on Mar 14, 2018
McKinsey Senior EM & BCG Consultant | Interviewer at McK & BCG for 7 years | Coached 400+ candidates secure MBB offers

Nice one! I would start by radically simplifying the setting via assumptions:

  • Assume sewerage hatchays are only located on streets
  • Assume a rectangular structure of the London street network with horizontal and vertical streets intersecting in a 90 degrees angle
  • Assume average distance of parallel streets of 200 metres
  • Assume London covers a geographical space of 12x12km
  • Assume there is a sewerage hatchay every 250 metres on average (4 per km)

The general calulcation then looks something like:

[Total length of London street network in km] x [Number of sewerage hatchays per km] = Total number of sewerage hatchays in London

Hence, you need to to calculate the total length of the street network first:

[Number of streets x average length] = Total length of street network

From our assumptions we infer that the number of horizontal streets is 12x5=60 (since there are 5 parallel streets per km). The same is true for vertical streets: 12x5=60. So the total length of the street network is (60+60)*12km = 1440 km.

Now inserting into our above calculation yields:

1440 km x 4 = 5760

So, given the above assumptions, there are roughly 5750 sewerage hatchays in London.

It is important to also stress that this result is equally sensitive to all assumptions (since all elements are connected via multiplications). Hence, changing an assumption by a certain percentage will directly translate into a corresponding percentage-change in the result.

Cheers, Sidi

Similar Questions
Consulting
McKinsey First Interview Question – Was My Approach Wrong?
on Jun 01, 2025
Global
6
100+
Top answer by
Mihir
Coach
McKinsey Associate Partner and interviewer | Bulletproof MBB prep
4
6 Answers
100+ Views
+3
Consulting
Preparing for McKinsey PEI
on Jul 10, 2024
Global
7
5.0k
Top answer by
Nilay
Coach
Former McKinsey Sr Engagement Manager | Trained McKinsey interviewer (100+ interviews, 500+ coaching sessions)
116
7 Answers
5.0k Views
+4
Consulting
McKinsey feedback call after rejection
on Jun 19, 2024
Global
7
3.0k
Top answer by
Hagen
Coach
#1 recommended coach | >95% success rate | 8+ years consulting, 8+ years coaching and 7+ years interviewing experience
68
7 Answers
3.0k Views
+4