Is it fine if my brainstorming structure is two buckets like A and B , followed by list of ideas under each or do I need sub-buckets like A.1 and A.2 vs B.1 and B.2 with 2-3 ideas under each sub-bucket?
Is there a difference in expectation between McKinsey vs Bain/BCG for this? I hear McK cares more about the levels