Verabrede dich zum Casen über das Meeting-Board, nimm an Diskussionen in unserem Consulting Q&A teil und finde gleichgesinnte Interview-Partner:innen, um dich auszutauschen und gemeinsam zu üben!
Zurück zur Übersicht

What is the capacity of the shelf space available?

Considering other constraints not mentioned in the case summary

3
2,2k
22
Schreibe die erste Antwort!
Bisher hat niemand auf diese Frage reagiert.
Beste Antwort
am 11. Dez. 2019
McKinsey | NASA | top 10 FT MBA professor for consulting interviews | 6+ years of coaching

Hi Sujay,
do you mean the space available for the cellar? The point appeared to be relevant at the beginning of the case, but later it has not been processed. It often happens that important aspects of the case are not crucial for the particular solution that the interviewer has in mind and, since the case can last 20-30 minutes max, it will be neglected.

Hope it helps,
Antonello

S
am 11. Dez. 2019
Thank you for the insight Antonello.
Clara
Coach
am 12. Dez. 2019
McKinsey | Awarded professor at Master in Management @ IE | MBA at MIT |+180 students coached | Integrated FIT Guide aut

Hello!

It does not specify further, hence, not relevant for the case. 

Cheers, 

Clara

S
am 14. Dez. 2019
Thank you Clara.

Think in a real interview, it is acceptable to assume the calculated shelf space required does not exceed the total shelf space or assume that the shelf space can be tailored according to the most economic arrangement. 

0